CGI Driveway & Pavers: The Miami Owner’s Guide
CGI driveway and paver systems in Miami typically run $8,260-$21,240 installed for paver driveways and $5,310-$14,160 for concrete, depending on substrate condition and whether we’re matching existing CGI patterns or starting fresh. We stock CGI-compatible edge restraints, polymeric sand, and paver base materials on our trucks, and most CGI paver repairs in Coral Gables, Pinecrest, and Aventura are completed in a single day. Most homeowners notice the problem after a heavy rain: pavers shifting, edge restraints pulling away, or joint sand washing out from between the stones.
Which CGI Models This Applies To
CGI, or Concrete Graphics Inc., produces stamped concrete overlays, paver systems, and decorative concrete coatings under several product lines that were popular in South Florida between 2008 and 2018. The most common we encounter are the CGI Stone-Crete stamped overlay series and the CGI Paver-Crete thin-paver system, both of which used proprietary color hardeners and release agents that affect how repairs blend.
To identify your CGI system, check for a stamp pattern code near the garage or along an expansion joint - CGI typically stamped a small “CGI” and date code into the concrete near control joints. For paver systems, the original edge restraint was often CGI’s black PVC version, which becomes brittle in Miami’s UV exposure after six to eight years and cracks at the spike holes. The OEM replacement is no longer manufactured, but we source a compatible commercial-grade aluminum edging from Perma-Edge that accepts the same 10-inch spike spacing and holds up better in our coral rock substrate.
Matching the color is the gotcha: CGI’s color hardeners were site-mixed, so two driveways poured the same week can differ. We pull a core sample, send it to a matching lab in Hialeah, and document the formula in your file. Under Clause 1 of the Haven Standard, that written color-match price is what you pay - no surprises if the first batch needs adjustment.
Signs Your CGI Driveway & Pavers Is Failing

- Pavers shifting or rocking underfoot. This usually means the bedding sand layer has washed out or compacted unevenly. In Miami, our sandy soil and heavy downpours accelerate this - water finds the path of least resistance through joint sand, undermining the base.
- Edge restraints pulling away from the perimeter. The PVC or aluminum edging that locks pavers in place loosens as spikes work free in our soft coral rock. Once the edge goes, the field pavers migrate outward and the pattern unravels.
- Joint sand washing out or growing weeds. Polymeric sand breaks down after five to seven years in Florida’s cycle of saturation and intense drying. Weeds indicate the sand has lost its binder and water is penetrating freely.
- Surface spalling or color flaking on stamped concrete. CGI’s overlay systems are thin - typically 1/4 to 1/2 inch - and delaminate when moisture gets trapped underneath. South Florida’s humidity makes this more common than in drier climates.
- Ponding or poor drainage after rain. The substrate has settled or the original pitch was lost during previous repairs. In Miami-Dade’s flat terrain, even a 1-percent grade loss creates standing water that accelerates every other failure mode.
Before
AfterReplacement Cost & What’s Included
| Service | Price Range in Miami |
|---|---|
| CGI paver driveway installation (new) | $8,260-$21,240 |
| Concrete driveway installation | $5,310-$14,160 |
| Driveway replacement (remove and replace) | $5,900-$16,520 |
| Paver patio installation | $4,130-$12,980 |
| Driveway sealing | $295-$825 |
What drives the range: substrate condition is the big variable. If we’re pouring over stable compacted fill, we’re at the lower end. If we need to remove failed CGI overlay, regrade for drainage, and import structural fill to replace washed-out base material, costs move up. Our quotes itemize each layer - demolition, base prep, bedding, pavers, edge restraint, joint sand, sealing - so you see where the money goes.
Every CGI driveway or paver job carries our 365-Day Done Right Promise. The written scope specifies brands: we typically use Belgard or Techo-Bloc pavers when replacing CGI systems, with polymeric sand from Techniseal and sealers from SRW. The photo record, included standard, shows before, during, and after - substrate exposed, base compacted, final pitch verified with a laser level. Measure twice, write it down, then build it.
DIY or Call Us?

There’s safe checking, and then there’s work that goes wrong fast.
An owner can walk the driveway after rain and note where water pools, or photograph cracked edge restraints for our review. That’s useful information and costs nothing.
Where DIY fails on CGI paver systems: re-leveling pavers without addressing the base layer guarantees the same rocking in six months. Power-washing stamped concrete with too much pressure strips the color hardener. And installing new edge restraint with the wrong spike length - standard 8-inch spikes in Miami’s loose coral rock pull out in the first heavy rain; we use 10-inch galvanized spikes driven at alternating angles.
We also stock the compatible materials. The aluminum edging, the right polymeric sand for joint widths under 1/4 inch, the sealer that won’t blush in 85-percent humidity - these aren’t on the shelf at the big-box store in the right spec. Call (786) 321-4970 and we’ll schedule a free estimate with a written price before any work starts.
FAQs
CGI stamped overlays last 10-15 years in South Florida’s climate; paver systems last 20-30 years if the base and edge restraints are maintained, though joint sand needs renewal every 5-7 years. The salt air and intense UV exposure here accelerate surface degradation compared to northern climates. Call (786) 321-4970 for an exact quote on your condition - estimates are free.
Localized repairs work if the substrate is sound and the damage covers less than 20 percent of the surface. We cut out the failed section, match the pattern and color, and tie into the existing field. If the base is compromised or the CGI overlay is delaminating across the slab, replacement is the honest recommendation. Call (786) 321-4970 for an exact quote - estimates are free.
Most edge restraint and joint sand repairs in Miami are completed in one day. Full driveway replacements take 3-5 days, including base prep, compaction, and cure time before sealing. We don’t rush the base - a day saved there costs a year of callbacks. Call (786) 321-4970 for an exact quote - estimates are free.
We stock polymeric sand, commercial-grade aluminum edge restraint, compatible sealers, and base materials on our trucks. CGI-specific color hardeners are no longer manufactured, so we color-match through our Hialeah lab and document the formula in your file for future touch-ups. Call (786) 321-4970 for an exact quote - estimates are free.
Rowan Construction Group Miami is an independent service provider and is not affiliated with CGI. We also stock and install parts and materials compatible with KraftMaid, Cambria, and Silestone products.