Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Wellborn Home Additions & ADU: The Miami Owner’s Guide
Wellborn cabinet systems in Miami home additions and ADUs typically run $53,100-$153,400 installed, depending on whether you’re building a 400-square-foot studio ADU in Little Havana or a full second-story addition in Coral Gables. We stock and install Wellborn-compatible cabinet configurations, hardware, and trim packages across all current series, with most replacement components available within 48 hours. If your Wellborn soft-close hinges are clicking, drawer glides are binding, or cabinet boxes are swelling from humidity, the fix is usually a same-day parts swap rather than a full replacement.
Most Miami owners discover a Wellborn part is failing when a drawer won’t stay on track after the third adjustment, or when cabinet doors in a converted garage ADU start sagging despite the hinges being tight. The salt air and seasonal humidity spikes here accelerate wear on hardware that was spec’d for drier climates.
Which Wellborn Models This Applies To
We work with Wellborn’s full residential lineup: the Aspire series (thermofoil and painted finishes), the Premier series (all-wood construction with plywood boxes), and the Estate series (custom-grade with solid-wood dovetail drawers). The part you need depends on when your cabinets were manufactured. Pre-2018 Premier cabinets used Blumotion clip-top hinges with a 35mm cup pattern; post-2018 production shifted to a modified plate geometry that looks identical but mounts 2mm offset. If you’re swapping hinge plates in a Miami Shores ADU without checking the production stamp inside the door, you’ll end up with a door that closes but never seals flush.
To identify your exact part, look for the white spec label inside the sink base or on the hinge cup itself. The series code (AS, PR, or ES) plus a six-digit date stamp tells us whether to order OEM from Wellborn’s Alabama factory or source an equivalent from our hardware supplier. For most Miami jobs, we use OEM hinge sets and drawer boxes but switch to heavy-duty aftermarket glides rated for 100-pound dynamic load, the standard spec in our ADU builds from Pinecrest to Wynwood. The aftermarket glides cost 15% less and carry the same lifetime residential warranty.
Signs Your Wellborn Home Additions & ADU Is Failing

- Drawer fronts pulling away from the box. The particleboard substrate in older Aspire units swells when humidity exceeds 70% for extended periods, which in Miami happens roughly eight months of the year. The glue line fails, and the front separates even if the glide hardware is intact. We see this most in ground-level ADUs near the water table where dehumidifiers weren’t spec’d.
- Soft-close hinges losing their damping. The hydraulic cylinder inside a Blumotion hinge has a finite cycle count, typically 80,000-100,000 openings. In a busy Miami kitchen addition used by a multi-generational family, that’s five to seven years. Once the oil seal degrades, the door slams the last two inches.
- Adjustable shelf pins wallowing out. Wellborn’s 5mm shelf pin holes in MDF gables enlarge if shelves are overloaded with small appliances. The pin still holds, but the shelf tilts and items slide. This is cosmetic until the hole splits the gable edge, then the cabinet box needs rebuilding.
- Finish bubbling near the sink or cooktop. Thermofoil wraps on Aspire cabinets delaminate when steam hits a chip or seam. The PVC lifts, traps moisture, and the MDF underneath swells. In Miami’s climate, a failed exhaust fan turns this from a blemish into a replacement in about eighteen months.
- Base cabinet toe-kick rotting. The composite toe-kick on Wellborn base cabinets sits directly on tile or concrete. In flood-prone Miami neighborhoods like Shorecrest or parts of Allapattah, minor seepage wicks up and degrades the material. We replace with composite-resistant PVC toe-kicks on every first-floor and ADU install now.
Before
AfterReplacement Cost & What’s Included
| Component | Miami Price Range | What’s Included |
|---|---|---|
| Wellborn hinge set (2 doors, OEM) | $85-$140 | Plates, screws, adjustment; 1-year parts warranty |
| Heavy-duty glide pair (aftermarket upgrade) | $65-$110 | 100-lb rated, full-extension; lifetime residential |
| Drawer box rebuild (Premier plywood) | $180-$290 | Dovetail box, front transfer, hardware transfer |
| Base cabinet gable replacement | $340-$520 | Disassembly, new gable, shelf pin drilling, reassembly |
| Full cabinet replacement (single base) | $720-$1,180 | Removal, new cabinet, level/shim, door transfer or new |
| ADU cabinet package (8-12 units) | $4,720-$15,340 | Design, delivery, install, adjustment period |
These numbers are installed prices with labor, not parts-only. A full home addition or ADU build in Miami runs $53,100-$153,400 depending on square footage, structural work, and whether you’re tying into existing HVAC. What drives the range: foundation type (slab-on-grade vs. elevated for flood zones), impact-rated window requirements per Miami-Dade code, and whether the ADU needs a full kitchen or just a kitchenette. Under Clause 1 of The Haven Standard, you get the written price before anyone picks up a tool. No change proceeds without a signed change order. That’s how we’ve kept 4,000-plus projects within a few percent of the agreed number since 2007.
DIY or Call Us?

There’s a clear line between what a homeowner can handle and what turns into a bigger problem. Swapping a hinge or adjusting a drawer front with a Phillips head and patience? That’s reasonable. But rebuilding a drawer box square, or replacing a gable without disturbing the countertop and adjacent cabinets, requires the cabinet to come apart in sequence. We’ve been called to Miami jobs where a homeowner’s well-intentioned hinge swap stripped the screw holes in the door, turning a $110 repair into a $340 door replacement.
The other factor is documentation. If your Wellborn cabinets are part of a permitted ADU or addition, any structural modification to the kitchen layout may require plan amendment. We handle that paperwork as part of the scope. Call (786) 321-4970 and we’ll walk through what you’re seeing. If it’s a five-minute fix, we’ll tell you. If it’s not, we’ll put the number in writing before we start.
FAQs
Hinges and glides typically last 10-15 years in climate-controlled spaces, but we’ve seen them fail in five years in unconditioned garage ADUs where summer humidity hits 90% consistently. The cabinet boxes themselves, if kept dry, last 25-plus years. Call (786) 321-4970 for an exact quote on extending your hardware life with proper ventilation - estimates are free.
Most failures are component-level: a hinge, a glide, a drawer box. We replace the part, not the cabinet, roughly 80% of the time. Full replacement makes sense when the box is water-damaged, the gables are split, or you’re reconfiguring the layout. We’ll show you the photo record of what we found and give you both options in writing. Call (786) 321-4970 for a free assessment.
A hinge or glide replacement takes 30-60 minutes per cabinet. A drawer box rebuild runs 2-3 hours including removal, transfer of hardware, and adjustment. Full base cabinet replacement in an existing kitchen addition is a half-day job if the countertop stays, or 1-2 days if we’re cutting new stone. We don’t quote speed; we quote completion with the photo record delivered. Call (786) 321-4970 to schedule.
We stock Blumotion hinge sets, heavy-duty glide pairs, and common shelf pin configurations on every service vehicle. OEM Wellborn-specific components like matched door fronts or custom-sized drawer boxes ship from their Ashland, Alabama factory in 5-7 business days. For most Miami repairs, we’re back with parts within 48 hours of the first visit. Call (786) 321-4970 to confirm availability for your model.
Rowan Construction Group Miami is an independent contractor and is not affiliated with Wellborn Cabinet, Inc. We also stock and install parts for KraftMaid, Cambria, and Silestone products.
Grant Rowan grew up in Los Angeles, learned the trade at Los Angeles Trade-Technical College, and has been running crews in South Florida for over a decade. The discipline of measuring twice, writing it down, then building it came from those early jobs where a skipped dimension turned a Saturday into a Sunday. We’ve applied that same discipline to 4,000-plus projects since 2007.
Written by Grant Rowan, Owner, Rowan Construction Group Miami at Rowan Construction Group Miami, serving Miami and nearby areas.







Before
After
Before
After