A Rowan company - serving Miami, FL
A new rear addition with a vaulted beamed ceiling and tall windows
Home Additions & ADU · Miami Shores, FL

Home Additions & ADU in Miami Shores - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

21+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee
Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Miami
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
A remodeled primary bathroom with a soaking tub and walk-in shower
A new clay tile roof
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as$199/month*On approved credit; ask for current terms
Get your free estimate

Fast, Reliable Home Additions & ADU Across Miami Shores

Home additions and ADU construction in Miami Shores, FL typically run $53,100-$153,400 for room additions and second-story builds, with detached ADUs starting at $106,200. Every project here requires parallel approval from both the Miami Shores Architectural Review Board and Miami-Dade County’s High-Velocity Hurricane Zone (HVHZ) permitting office, a dual compliance burden no neighboring municipality matches at this intensity. We coordinate both tracks from our Miami office, with crews serving Miami Shores locally and a live person answering calls at (786) 321-4970.

Call (786) 321-4970

We’ve learned that Miami Shores construction lives or dies by sequencing. Pull a Miami-Dade permit first, install HVHZ-compliant materials, and discover the ARB never signed off - you’re tearing off that roof or pulling those windows and starting over. Our Home Additions & ADU team files both packets in parallel, front-loads the ARB milestone on every draw schedule, and never lets framing sit exposed through hurricane season waiting on a committee.

Why Rowan Construction Group Miami Is Miami Shores’s Preferred Home Additions & ADU Company

A garage converted into a guest room and home office

We’ve delivered over 4,000 projects since 2007, every one with a written price before work started and a documented photo record when the crew left. In Miami Shores specifically, that discipline matters more than most places - the village’s concentrated stock of 1920s-1950s Mediterranean Revival homes, with their original clay barrel-tile roofs and stucco-over-masonry walls, demands contractors who understand both historic preservation and modern HVHZ structural requirements.

Our crews are background-checked, uniformed, and trained on the local failure modes: the near-surface oolitic limestone that can turn a simple ADU slab pour into a mechanical chipping operation, the ARB’s strict enforcement of eaves lines and material palettes, the moisture intrusion patterns that high humidity drives through aging stucco. We don’t guess. We measure, document, and quote flat.

Under Clause 1 of The Haven Standard, the price is written before anyone picks up a tool. Under the 365-Day Done Right Promise, if it’s not done right, we make it right - backed by a terms page, not a handshake. And our Free Second Opinion on any written estimate means you can bring a competitor’s quote and we’ll review it line by line at no charge.

Calls are answered by a live person 24/7. Scheduling is coordinated from our Miami office, with crews dispatched to Miami Shores as local projects demand.

Explore

Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Our Home Additions & ADU Services in Miami Shores

ADU Design & Permitting

ADU design and permitting in Miami Shores starts at $106,200 and demands a submittal packet that satisfies two masters: Miami-Dade HVHZ for wind-load connections, impact-rated glazing, and roof-to-wall tie-downs, plus the Miami Shores Architectural Review Board for aesthetic compliance with the village’s historic character. We prepare both packets simultaneously - site plans, elevations, material samples, color palettes, and structural calculations - because filing them sequentially adds weeks to a calendar already compressed by hurricane season windows.

The ARB wants to see that your stucco finish matches existing texture, that roof pitch respects the Mediterranean Revival eaves line, that window proportions don’t read as modern insertions. We know which stucco integra-color mixes the ARB has approved on recent projects, which low-slope membrane details pass both wind-uplift and visual review, and how to spec impact-rated windows from manufacturers whose frame profiles read traditional. Our permit team files the Miami-Dade application and the ARB certificate request as parallel tracks, not sequential ones.

ADU Design & Permitting

Garage Conversion ADU

Garage conversion ADUs in Miami Shores run $35,400-$94,400 and present a specific ARB challenge: the exterior change from garage door to window wall or entry system is a material alteration requiring pre-approval. We’ve seen contractors skip this step, install a beautiful HVHZ-compliant window assembly, and receive a village order to restore the garage door because the ARB packet was never submitted.

Our process starts with the ARB certificate, not the building permit. We document the existing garage face, propose the new fenestration pattern, and secure ARB sign-off before any Miami-Dade permit gets pulled. Only then do we spec the impact-rated windows, the conditioned floor slab (often requiring excavation through that oolitic limestone), and the mini-split HVAC integration. The draw schedule reflects this sequence - no rough-in starts until both approvals are in hand.

Garage Conversion ADU

New Detached ADU

New detached ADUs are our most complex Miami Shores project type, starting at $106,200 and often exceeding $200,000 when site conditions demand. The structure must meet HVHZ requirements for a standalone wind-load path - foundation to roof - while the ARB evaluates its visual relationship to the primary residence and neighboring properties. Height, massing, roof form, and exterior materials all face scrutiny.

On a 1940s Mediterranean Revival on NE 96th Street, our crew added a rear primary suite and a detached ADU, but only after the Architectural Review Board pre-approved the stucco-finished, low-slope addition that matched the original barrel-tile eaves line. We submitted the ARB packet and the Miami-Dade HVHZ load-bearing and impact-rated glazing plans in parallel, so the rough-in and roof-to-wall tie-downs passed inspection sign-off without a single change order from wind-uplift corrections. The whole sequence ran on a draw schedule that front-loaded the ARB and permit milestones, so no subfloor or framing sat exposed through hurricane season waiting on a committee.

The near-surface oolitic limestone on that lot required mechanical chipping for the ADU foundation - a site condition we identified during pre-construction probe pits and priced into the written quote, not discovered as a surprise during excavation.

New Detached ADU

Junior ADU & Interior Conversion

Junior ADUs and interior conversions in Miami Shores typically fall in the lower portion of our range - $35,400-$94,400 depending on whether the project stays within existing walls or requires structural modification. These projects sometimes avoid full ARB review if no exterior material changes occur, but the moment you add an exterior door, modify window openings, or alter the roofline for a dormer, the ARB certificate becomes mandatory.

We evaluate every interior conversion for its ARB trigger points during the initial site visit. If the project can proceed as a Miami-Dade permit only, we say so. If ARB involvement is required, we build the timeline and cost around that reality from day one. No surprises at permit intake.

Junior ADU & Interior Conversion
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (786) 321-4970

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Trusted Brands We Service in Miami Shores

Our sourcing depth across fifty-plus vetted brands gives the written quote honest numbers rather than inflated ones. For Miami Shores additions and ADUs, we regularly specify GAF and Owens Corning roofing systems with HVHZ-approved uplift ratings that also offer color and texture profiles passing ARB review on Mediterranean Revival restorations. Impact-rated windows from manufacturers meeting Miami-Dade NOA requirements come in divided-lite patterns that read historically appropriate - not the industrial frames that draw ARB rejections. We stock local access to these product lines so material lead times don’t stall a permit-ready project.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Home Additions & ADU Problems We See in Miami Shores Homes

  • ARB sequencing failures. Contractors unfamiliar with Miami Shores pull a Miami-Dade building permit and install HVHZ-compliant roofing or impact-rated windows, only to discover the ARB certificate was never obtained. The village can order tear-off and restart. We file both tracks in parallel and never start work until both approvals are in hand.
  • Oolitic limestone excavation surprises. The near-surface Miami limestone sits inches below grade across much of the village. ADU foundations, addition footings, and underground utility runs that assume normal soil excavation hit rock that requires mechanical chipping or controlled blasting. We probe during pre-construction and price the actual condition, not a soil assumption.
  • Modern design rejections. Flat roofs, high-pitch contemporary forms, and industrial material palettes clash with the concentrated Mediterranean Revival stock and draw ARB rejections that reset the calendar by weeks. Our design team knows which roof pitches, eaves depths, and stucco textures have recent ARB precedent.
  • Moisture-wind double failure. High humidity accelerates stucco and mortar deterioration while hurricane season demands envelope integrity. Additions must address both simultaneously - proper weep screed drainage, sealed penetrations, and impact-rated assemblies that don’t compromise the vapor management of historic walls.

Pricing for Home Additions & ADU in Miami Shores, FL

A second-story addition that matches the existing roofline

A typical home addition in Miami Shores runs $53,100-$153,400. Detached ADU construction starts at $106,200 and can reach $259,600 depending on size, foundation conditions, and finish level. Garage conversions fall at $35,400-$94,400. These ranges reflect Miami-Dade HVHZ material premiums, the ARB design documentation required, and the site preparation realities of oolitic limestone excavation.

Service Price Range in Miami Shores
Home Addition $53,100 - $153,400
ADU Construction $106,200 - $259,600
Garage Conversion $35,400 - $94,400

What moves the number: foundation depth and rock conditions, square footage, kitchen or bath inclusion, impact-rated window count, and whether the ARB requires design revisions that add documentation hours. Every quote is flat, written, and includes a written scope and warranty. No change proceeds without a signed change order - the discipline that has kept our projects within a few percent of the agreed cost across 4,000-plus jobs. Call (786) 321-4970 to schedule your free estimate.

We Also Serve Cities Near Miami Shores

Our crews build throughout the metro core, including Miami Shores neighbors: Miami to the south, Brownsville to the west, Miami Beach across the bay, and Miami Springs to the northwest. Each municipality carries its own permitting landscape - none duplicate the Miami Shores dual ARB-HVHZ gauntlet - and we adjust our filing strategy accordingly.

Serving Miami Shores, FL - Our Local Coverage Area

We’re based in the Miami Shores area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs - Home Additions & ADU in Miami Shores

A remodeled family room with new windows and a window seat

Why Miami Shores Chooses Rowan Construction Group Miami

We set the standard for home additions & adu in Miami Shores.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Miami Shores

Getting your home additions & adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your home additions & adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Miami Shores - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local home additions & adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Miami Shores Customers Say

Trusted by homeowners across Miami Shores and surrounding areas.

★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O. · Verified customer
★★★★★

"Good communication throughout. Weekly written update meant I never had to chase them."

Nadine G. · Verified customer
★★★★★

"Solid work, decent crew, and the site was left tidy every evening."

Pearl A. · Verified customer

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new bay window with a cushioned seatA new wood side gate with black hardwareA new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valley

More services in Miami Shores

Every project below starts the same way: a free on-site visit and a written price.

Roofing

Shingle, tile and metal roofs over new underlayment and flashing, with new gutters and a full clean-up.

Explore roofing

Getting started with Rowan in Miami

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Miami team

A local crew that works across Miami and the towns around it, to the same written standard as every Rowan location.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Home Additions & ADU in Miami Shores?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Miami Shores.

(786) 321-4970

Request a Free Estimate in Miami Shores

Tell us about your home additions & adu needs - we'll respond within the hour.

When you send us your details, you agree to the terms of our Privacy Policy and agree to be contacted through phone, text, or email regarding your project, including by the service partners who may complete the work.

Prefer to text? Text Now
Areas We Serve
Call Now - 24/7 Dispatch