A Rowan company - serving Miami, FL
Rowan Construction Group Miami construction team

Shower Replacement Cost - Fixed Price, Set Finish Date

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as $199/month*on approved credit; ask for current terms
Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

How Much Does Shower Replacement Cost in Miami?

Shower replacement in Miami typically costs between $3,540 and $10,030, with most homeowners landing around $6,500 for a mid-range prefab-to-tile conversion in a standard 3-by-3-foot or 3-by-5-foot stall. The range is wide because “shower replacement” covers everything from swapping a cracked prefab unit for a new one to stripping a tub surround down to the studs, installing a waterproof membrane system, and tiling a custom walk-in – all in the same city, sometimes in the same zip code.

At Rowan Construction Group, we’ve been pricing bathroom work across Miami since 2007 – Brickell, Coral Gables, Doral, Kendall, Hialeah, and the coastal neighborhoods from Coconut Grove up to Aventura. The numbers below reflect what our crews actually quote in those neighborhoods in 2026, not a national average padded to look reasonable.

Shower Replacement Cost Breakdown (2026)

A shower replacement in Miami breaks down across several line items. Understanding each one is the fastest way to read a contractor’s quote and know whether the number is honest.

Line Item Low End High End Notes
Demo and disposal $350 $750 Higher if old fiberglass surround is adhered to drywall that needs replacing
Waterproofing membrane $400 $900 Schluter Kerdi or similar sheet membrane; critical in Miami’s humidity
Shower pan / base $300 $1,800 Acrylic base on the low end; custom mortar bed or Schluter Kerdi-Shower tray on the high end
Tile and materials $600 $2,500 Builder-grade ceramic to large-format porcelain (24-by-48 slabs)
Tile installation labor $700 $1,800 Per square foot rate runs $12-$22 in Miami; intricate patterns cost more
Fixtures (valve, showerhead, trim) $250 $1,200 Kohler Artifacts or Moen Gibson mid-range; Toto and Hansgrohe at the top
Glass enclosure or curtain rod $200 $1,500 Frameless 3/8-inch tempered glass runs $900-$1,500 installed
Plumbing rough-in adjustments $0 $800 Only if valve location moves or supply lines need rerouting
Permit (Miami-Dade) $125 $350 Required when plumbing is altered; Rowan pulls the permit – homeowner never has to chase it

Total typical range: $3,540-$10,030. A basic replacement – new prefab acrylic unit, same footprint, no plumbing relocation – sits at the lower third of that range. A fully tiled, walk-in conversion with a frameless enclosure, large-format porcelain, and a thermostatic valve sits at the top. The middle of the range, roughly $5,500-$7,500, covers the most common project we see in Miami: a dated 36-by-36 or 36-by-60 stall stripped to the studs, re-waterproofed, and retiled with a quality ceramic or mid-grade porcelain.

How Miami’s Market Moves These Numbers

Labor in Miami runs about 15-20 percent above the national median for tile work, driven by a tight pool of experienced tile setters and a strong pipeline of new construction that keeps crews busy year-round. Material costs track close to national supplier pricing – we source from Daltile, Florida Tile, and MSI Stone through accounts that let us pass commercial pricing to residential customers – but large-format tiles (anything 24 inches or wider) add a handling and labor premium because cutting and leveling them takes longer and requires specific equipment. That’s not a surcharge; it’s the actual time on the job.

Miami-Dade County also has specific moisture and wind-load provisions in its building code that go beyond the Florida Building Code baseline. Shower work that alters plumbing requires a licensed plumbing contractor on the permit, and any structural modification to the wet area – say, removing a knee wall to open a walk-in – triggers an inspection. We factor permit fees and inspection scheduling into every written quote, so that number doesn’t appear as a surprise on the final invoice.

What Affects Shower Replacement Pricing in Miami

Professional contractor applying thin-set mortar for a kitchen tile backsplash installation
What Affects Shower Replacement Pricing in Miami
  • Existing substrate condition. Miami’s humidity is aggressive. In older homes in Little Havana, Overtown, or the Biscayne corridor, we regularly find water-damaged cement board or even rotted wall framing behind the original surround. Replacing a single sheet of cement board adds $150-$300; replacing a 6-foot section of framing adds $400-$800. We photograph everything before closing the walls – that’s the documented photo record that comes standard with every Rowan project – so the homeowner sees exactly what the crew found.
  • Shower size and footprint changes. Keeping the same footprint is the single biggest cost lever. The moment the drain moves or a wall comes down to expand the stall, rough-in plumbing costs enter the quote. A drain relocation in a slab-on-grade home – which describes most of Miami’s housing stock built after the 1970s – requires saw-cutting the concrete slab, which adds $500-$1,200 to the job depending on the distance.
  • Tile selection. Builder-grade 12-by-12 ceramic runs $1.50-$3.50 per square foot in material; 24-by-48 porcelain book-match panels run $8-$18 per square foot. The labor rate also rises with tile size and pattern complexity. A herringbone or offset 12-by-24 layout in a 36-by-60 stall might add $300-$500 in labor versus a straight stack.
  • Fixture grade. A Kohler Pressure-Balancing valve with a single showerhead runs $300-$500 in fixtures. A thermostatic Hansgrohe or Toto system with a rain head, hand wand, and body sprays can reach $1,500-$3,000 in fixtures alone before a single tile goes on the wall. We source Kohler and Toto through vetted accounts, so the material pricing in the written quote reflects actual cost – not a retail markup passed through.
  • Glass enclosure type. A basic chrome-frame sliding door runs $200-$400 installed. A frameless 3/8-inch tempered glass door with a brushed nickel pivot hinge runs $900-$1,500. Frameless looks clean and is easier to clean – there are no aluminum channels to collect soap scum – but it is a real cost driver. In Brickell and Coral Gables condos, we see frameless specified on virtually every job; in Kendall and Doral, the mid-range framed enclosure is the more common choice.
  • Condo rules and HOA requirements. A significant share of Miami’s housing stock is high-rise or mid-rise condo. Many HOAs require proof of insurance, specific work hours (no demo before 9 a.m., no power tools after 5 p.m.), elevator protection, and sometimes an architectural review of materials. These requirements don’t change the tile price, but they affect scheduling and occasionally require additional material protection – padded elevator blankets, hallway floor runners – that we account for in the quote. A job that would take four days in a Kendall single-family home might take six in a Brickell tower. The written scope describes that timeline honestly.
BeforeBefore
AfterAfter

Prefab vs. Custom Tile: Which Is Right for Your Miami Home?

This is the question that more than anything else determines where a job lands in the $3,540-$10,030 range, so it deserves a direct answer rather than a “depends.”

Prefab Acrylic or Fiberglass Units

A one-piece or three-piece acrylic surround installed over a new acrylic base is the fastest, least expensive replacement. Expect $3,500-$5,500 all in for a standard 36-by-36 or 36-by-60 stall, assuming the framing is in good shape. These units – brands like Kohler Choreograph or Sterling – are durable, low-maintenance, and easy to clean. The limitation in Miami is aesthetics: most buyers in the $500,000-and-up resale market that defines Coral Gables, South Miami, and Pinecrest expect tile. A prefab surround in those markets can actually reduce resale appeal relative to a tiled shower, so the math isn’t always as simple as “cheaper is better.”

Custom Tile

A custom-tiled shower in a standard Miami footprint runs $5,500-$10,030 depending on tile selection, fixtures, and enclosure. The labor is higher, the timeline is longer (typically 5-8 days vs. 1-2 for a prefab swap), and the process requires more decisions from the homeowner. But the waterproofing is done properly – Schluter Kerdi membrane or a foam-backed shower tray, bonded to the substrate before a single tile goes down – and the result is permanent rather than a replacement for the replacement. In Miami’s climate, the membrane step is not optional. Any contractor skipping it to lower the price is handing you a mold problem in 3-5 years.

Miami Permit Requirements for Shower Replacement

Professional contractor installing a stone countertop during a kitchen remodel
Miami Permit Requirements for Shower Replacement

Miami-Dade County requires a permit when plumbing is altered – meaning any job that moves a supply line, relocates a drain, or changes a valve rough-in. A straight like-for-like swap (same drain location, no plumbing changes, just new tile over a properly prepped substrate) may not require a permit, but if there is any doubt, pulling one is the right call. An unpermitted bathroom alteration in Miami-Dade can complicate a sale inspection and, in some cases, require remediation at the seller’s cost.

Rowan pulls the permit when it’s required. That’s in the written scope, not a separate conversation. The permit fee ($125-$350 for a typical residential shower project in Miami-Dade) is included in the quoted price – it doesn’t arrive as a surprise line item after the job is underway. Under Clause 1 of the Haven Standard, the price is written before anyone starts, and “written” means every line item, including permit fees.

Get the price in writing before anything starts.A real person answers, day or night.
Call now

How to Save on Shower Replacement in Miami

There are real ways to reduce cost without cutting the corners that matter – waterproofing, substrate prep, licensed labor. Here’s where the money can move without sacrificing quality.

  • Keep the footprint. The single highest-leverage decision is not moving the drain. Slab-on-grade homes in Miami require concrete cutting when the drain relocates, which adds $500-$1,200 and at least a day to the job. If the shower size works, don’t move it.
  • Choose a 12-by-24 or similar mid-format tile. Large-format porcelain looks current and installs faster than mosaic or herringbone patterns. It costs less in labor than tiny tiles and less in material than premium 24-by-48 slabs. Brands like Florida Tile’s Palio line and Daltile’s Perpetuo series sit in a price-to-performance range that photographs well and holds up in Miami’s hard water.
  • Select a mid-range pressure-balancing valve rather than a thermostatic system. A Kohler Rite-Temp or Moen Posi-Temp valve with a standard showerhead performs reliably and costs $250-$400 in fixtures. A thermostatic system is a genuine upgrade, but for a shower used once a day by two people, the utility difference is marginal. Save the thermostatic valve for a primary suite renovation with a larger budget.
  • Use a prefab pan rather than a custom mortar bed. A Schluter Kerdi-Shower tray or a solid acrylic pan installs in a fraction of the time of a floated mortar bed and performs just as well for most applications. It’s a legitimate cost save, not a quality compromise.
  • Get a second opinion on any written estimate. Rowan offers a Free Second Opinion on any competitor’s written quote – a line-by-line review at no cost. If you’ve received a quote and something in it doesn’t add up, call (786) 321-4970 and we’ll walk through it with you. There’s no obligation, and the review is done in writing so you have a record of the comparison.
  • Schedule during off-peak months. Miami’s busy season for renovation runs October through April, when snowbirds return and discretionary remodel spending spikes. Scheduling a shower replacement in June or July doesn’t reduce material costs, but crew availability is better, lead times on tile and fixtures are shorter, and scheduling is more predictable. It won’t save thousands, but it may save a few weeks of waiting.

What You Get With Rowan Construction Group

Contractor installing marble countertop on white kitchen cabinets during renovation
What You Get With Rowan Construction Group

Grant Rowan founded this company in 2007 on a single operating principle: the price is in writing before anyone picks up a tool. That hasn’t changed across 4,000-plus projects. For a shower replacement in Miami, that means a written flat-price quote with a line-item scope, a written warranty, and a signed change order for anything that changes after the scope is agreed. No verbal additions, no “we’ll sort that out on the back end.”

Every crew member is background-checked and uniformed. Every visit includes a documented photo record – substrate condition before waterproofing, membrane installation before tile, finished installation before punch list. That photo record is delivered to the homeowner, not stored internally. If a question arises about what was done and when, there’s an answer in the file.

The 365-Day Done Right Promise backs every project: if the work isn’t right, Rowan makes it right. That’s printed on every proposal and backed by the Haven Standard’s terms, not an asterisk. Grant Rowan’s name is on every job, and that means the promise is personal.

For Miami homeowners comparing contractors for a Shower Replacement in Miami, the most useful thing we can show you isn’t a testimonial page – it’s a written quote with every line item named and priced before the first tile is ordered. That’s what we deliver.

How Shower Replacement Fits Into a Broader Bathroom Budget

Shower replacement is often the starting point of a bathroom conversation that expands once a homeowner sees the scope of work involved. For context, here’s how it fits next to related projects in the Miami market:

  • Bathroom Remodel (full): $10,620-$33,040 – includes shower, vanity, flooring, and fixtures
  • Small Bathroom Remodel: $5,900-$14,160 – a powder room or guest bath full update
  • Walk-In Shower Installation: $5,310-$14,160 – new footprint, typically from a tub-to-shower conversion
  • Tub-to-Shower Conversion: $4,130-$11,800 – removing the tub, resizing the opening, full tile
  • Bathroom Vanity Installation: $945-$3,540 – standalone vanity swap

If the shower replacement conversation is happening because the bathroom feels dated overall, the math often favors pulling a full bathroom remodel quote alongside the shower-only quote. The cost per square foot drops when demo, tile work, and fixture rough-in are done in a single mobilization rather than two separate jobs six months apart. That’s not a sales pitch – it’s arithmetic. We’ll price both options and let the numbers speak.

FAQs – Shower Replacement Cost in Miami

Two contractors framing a wall during a professional bathroom remodel.
FAQs – Shower Replacement Cost in Miami

How much does shower replacement cost in Miami in 2026?

Shower replacement in Miami costs $3,540-$10,030 in 2026, with the midpoint around $6,500 for a standard tile replacement in an existing footprint. The low end covers a prefab acrylic unit swap with no plumbing changes. The high end covers a fully custom-tiled walk-in with a frameless glass enclosure, large-format porcelain, and a thermostatic fixture system. Call (786) 321-4970 and we’ll deliver a written flat-price quote for your specific bathroom at no charge.

Does shower replacement require a permit in Miami-Dade County?

Yes, when plumbing is altered – any change to supply lines, drain location, or valve rough-in requires a permit from Miami-Dade County. A like-for-like tile replacement with no plumbing changes may not require one, but pulling a permit when there’s any doubt is the right call. Permit fees run $125-$350 for a standard residential shower project in Miami-Dade. Rowan pulls the permit on every job that requires one; the fee is included in the written quote, not added later.

How long does shower replacement take in Miami?

A prefab acrylic unit swap in an existing footprint takes 1-2 days. A custom-tiled shower replacement with waterproofing, tile, and a frameless glass enclosure typically takes 5-8 days, including time for mortar and grout to cure before the enclosure is installed. Condo projects in Miami – Brickell, Edgewater, Midtown – can add 1-2 days due to HOA work hour restrictions and elevator scheduling. The written scope we deliver before work starts includes the project timeline, so you know what to expect before the crew arrives.

Is it cheaper to repair a shower or replace it?

Repair is cheaper when the damage is isolated – a cracked grout joint, a single broken tile, a failing caulk line at the base. Repair costs for those issues run $150-$600 in Miami. Replacement makes more economic sense when the waterproofing has failed, there’s substrate damage behind the tile, or the surround is a 1980s-90s fiberglass unit that can’t be brought back to a presentable condition. We see this calculation come up often in Hialeah and Westchester, where original builder-grade showers are hitting the end of their functional life. If you’re not sure which applies, a written assessment with photos costs nothing – call (786) 321-4970 and we’ll look at it.

What’s included in Rowan’s shower replacement quote?

Every Rowan quote is a flat written price with a line-item scope covering: demo and disposal, substrate inspection and any required repair, waterproofing membrane, shower pan or base, tile and installation, fixtures, glass enclosure, permit fees if applicable, and cleanup. Nothing is left as “TBD.” If the crew opens the wall and finds unexpected rot or mold – which does happen in Miami’s climate – that triggers a written change order with a signed approval before any additional work proceeds. No change is done on a verbal agreement. That’s Clause 1 of the Haven Standard, and it’s what has kept Rowan’s projects within a few percent of the agreed price across more than 4,000 jobs since 2007.

How do I choose between a prefab and a custom tile shower in Miami?

Budget $3,500-$5,500 for a prefab acrylic replacement in an existing footprint; budget $5,500-$10,030 for a custom-tiled shower. The practical decision point is resale value and neighborhood expectation. In Coral Gables, South Miami, and Pinecrest, a tiled shower is the baseline expectation in the resale market. In Doral, Kendall, and parts of Hialeah, a quality prefab unit in good condition is a reasonable choice. The waterproofing standard doesn’t change between the two: a properly installed acrylic unit with a sealed base is watertight; a custom tile shower with a skipped membrane is not. Ask any contractor you’re evaluating exactly what waterproofing system they use – if the answer isn’t a named product and a specific installation method, that’s a red flag.


Get a Written Quote for Your Miami Shower Replacement

If you’re planning a shower replacement anywhere in Miami – Coconut Grove, Doral, Kendall, Hialeah, Brickell, Coral Gables, or anywhere in between – the first step is a written price with a named scope, not a ballpark on the phone. Rowan Construction Group has been delivering exactly that since 2007, on every project, in every trade we work.

Grant Rowan and the Rowan team are ready to assess your shower, photograph the existing conditions, and deliver a flat written quote before any work is scheduled. No verbal estimates, no “we’ll figure it out as we go.” The 365-Day Done Right Promise and the Free Second Opinion on any written estimate are standing offers – bring a competitor’s quote and we’ll review it line by line at no charge.

To schedule your free estimate, call (786) 321-4970. A live person answers 24/7. You can also learn more about our full scope of home construction services across the Miami market.

Pricing reflects the Miami market as of 2026. Rowan Construction Group Miami offers free estimates – call (786) 321-4970.

Written by Grant Rowan, Owner at Rowan Construction Group, serving Miami since 2007.

What Our Customers Say

★★★★★ 4.7 from 7+ reviews

"Good communication throughout. Weekly written update meant I never had to chase them."

- Nadine G.

"Solid work, decent crew, and the site was left tidy every evening."

- Pearl A.

"Fence and retaining wall along a sloped boundary. They photographed the footing depth at each post, which mattered when the county inspector came."

- Iona F.
Need Construction help in Miami? Licensed & insured · Written quotes before work starts response · free estimates
Call (786) 321-4970

Request a Free Estimate

Tell us what's going on in Miami - we'll get back to you fast. No obligation.

When you send us your details, you agree to the terms of our Privacy Policy and agree to be contacted through phone, text, or email regarding your project, including by the service partners who may complete the work.

Call Now - 24/7 Dispatch
Areas We Serve
Call Now - 24/7 Dispatch